By number of projects, yards woven, sales revenue generated from your weaving, or weave structures explored and mastered? Share your thoughts!

Comments

laurafry

There are many ways to measure progress.  I think it depends on one's personal goals.  Is the goal to sell one's work?  Understand the theory behind weave structures and how threads interlace to make fabric?  And so on.  

Since my goal from the beginning was to earn an income from weaving, one of my first tasks was to become as efficient as possible, so initial progress was measured in how I could dress the loom with the least amount of bottlenecks.

I also was very aware of repetitive stress injury (background in dance and sports) so I needed to work ergonomically - with the added benefit that with the fewest movements speed increased.

Learning how to build cloth that would serve its function and how to design textiles that would appeal to the buying public were all part of my learning curve.

Progress on so many fronts is not equal - some things came more easily than others.

I am still learning about the interaction of colours in woven structure and exploring the nature of cloth - how to combine different yarns to create cloth for specific purposes and to do it in a way that (hopefully) adds beauty to our world.  That is an on going challenge and keeps me excited about weaving after 35+ years.  :)

cheers,

Laura

sally orgren

I was telling someone today that I don't feel like I have woven much this year due to lots of work travel. I had a burst of weaving activity in January and early February, and then my floor loom was dormant until it finally got warped again just last week. 

I decided to do a quick tally of my 2012 projects, and I was quite surprised to see the results! 

> 18 projects (so far)

> 67 yards total

> Further breakdown:

  •5 projects completed on floor looms (8-9 yard warps per project)

  •10 on table looms (3-5 yard average)

  •3 on the Inkle (2 yard warps)

I think we all feel like "infrequent" weavers when we have so many other obligations in our lives.

Might you actually accomplish more weaving than you thought?

Has anyone every tracked exactly how many hours you spend, per week, on weaving-related activites? (Assuming you are not doing this for a living.)

kfsuko (not verified)

I haven't kept a tally of hours per week, but I have tracked time per project.  It seems like non-weavers' first question is "how long did it take you to weave that?"  And, of course, no one asked about those baby blankets! 

But a friend asked me to keep track of time on dishtowels that she carried in her store.  I'm not sure if she's still working on the documentary for which she wanted the time.  On a warp for 6 towels, I spent 77.65 hours from winding the warp to hemming the towels, or  12.9 hours per towel.  Needless to say I don't price items by time spent!

tomrsey (not verified)

I know what you mean.   There are too many interests/oblligations pulling in all directions.  I weave in spurts.   I have another hobby (woodcarving) and each demand some time. Then other obligations come in - house work, yard work, etc.    

I feel progress when I can start with an idea (that I didn't see in a book) and see it through to completion.   When I can modify a design that I have seen somewhere, and give it my own twist, I feel that I have progressed, as that is something I couldn't do before.  However, I am a pretty new weaver and it doesn't take much for there to be progress!!

I keep all my project notes in binders, but never counted them, but the numbers wouldn't be that high.  

tien (not verified)

I measure my success on an individual project along three axes:

(1) Did I enjoy the process of making it?

(2) Do I think the work is good?

(3) Did I learn something?

All three are important but I weight "Did I learn something?" much more heavily than the other two.  I can count a project a success even if it came out ragged-looking, if I learned something from it.

Measuring weaving progress...I am a slow weaver.  It took me 8 1/2 months to get one warp off the loom (ok, it was 37 yards of 60/2 silk, but still!).  I also don't particularly care about speed in finishing a project (though I am an efficiency nut - there's a difference!).  Since I might finish one or (at the outside) two projects in any given year, I judge my progress based on how much I learned and how much better this work is (in my opinion) than the last.

I have had milestones that meant something to me: getting a piece accepted into a juried show, winning "Best of Show", getting my first weaving article published, getting my work on the cover of Handwoven, and having a piece go into a museum collection.  But I think it's important to measure progress against internal standards rather than external ones - because external ones are basically about other people's opinions, and it's dangerous to depend too much on other people's opinions.  So mostly I ask myself, "Did I learn?" and "Is this piece better than my last?"

Cheryl M White

The "how long did it take to make that?" is my least favorite question, but such a common one.  I don't like to answer it in hours or minutes, because I try to get people to see the pleasure that I get from weaving.  After all if I just wanted a towel, I can buy one in the store (and so can my customers!!).  What we create is unique and a pleasure to make, to own, and to use.  I do try to weave efficiently, and use the time that I have to weave valuable, and since I do sell my work, I often make decisions that will simplify my job, but not effect the customer one bit. 

My last comment is that since I work outside the home, I do not want to punch a time clock when I am weaving.  This is my joy time.  Progress to me is that aha moment when something I visualized, warped and finished, comes out just the way I imagined it, especially when I learned something to make it so.

Cheryl

Peg.Cherre (not verified)

Because I sell my weaving and need to have what I consider to be an appropriate amount of stock for the shows I do, I do count the numbers of pieces I weave and the numbers I sell.

I, too, however, also count 'failures' as progress - things I wouldn't ever sell due to poor quality - when I tried a new technique, pattern, fiber, or idea as long as I learned something.  Expanding my skills each year is important to me, so I do push myself to try new things, to experiment, to 'play' with what I already know in a new way.

I also count as progress when I have learned a new process that improves my efficiency and/or my long term weaving health.  I can often thank Laura Fry for all of her teaching regarding technique, seating, etc.

In the end, my weaving has to make me happy.  If it doesn't make me happy, I won't do it.  Life's too short to be unhappy in this endeavor.  So my level of happiness is another measure of progress.

I think this is a great discussion - thanks for starting it, Sally.

Cheryl'B

I measure my progress by my confidence level.  I came to weaving through knitting.  With knitting I wasn't afraid to try new stitches/patterns etc.  However, with weaving there is a lot of time involved in the set-up that if I ruin a weaving project I'm heartbroke.  Yes, it is lessons learned but I'd rather have lessons learned with a beautiful outcome (okay, so I'm not so different than the rest of you right?).....hehehe

I guess it's just different and sometimes what I want to try intimidates me so when I just go for it (like my first doubleweave I'm just finishing up) it builds my confidence level and therefore I feel like I'm progressing.

C

sally orgren

 

Laura wrote—

"...one of my first tasks was to become as efficient as possible, so initial progress was measured in how I could dress the loom with the least amount of bottlenecks."

I think this makes sense from both an income-generating viewpoint, and also for those of us who only have "stolen" moments in the evenings or weekends from work, family, and other obligations to dedicate to weaving. I am always looking for ways to maximize my weaving fun when I have a limited amount of time ;-)

It is frustrating, but sometimes it takes me a few days just to decompress mentally from the rigors of a work trip/client interaction to even *think* about weaving. I can sit on the loom bench, but I can tell, it's just not "there". I end up unweaving more than weaving!

I also need time to process a potential design. That may be at the sketching or project calculation stage, and then again at the point of weaving a few inches and letting what I see on the loom actually sink in. That is probably why I like to have a few projects going at the same time. (i.e. so many projects on those table looms, and a project calculation notebook/laptop with weaving software when I am on a plane.) 

I don't think I have actually thought about/measured the creative process in terms of my overall weaving activities. If I were weaving to sell, I would need to factor this time in. And as someone else also mentioned, I am not sure I would enjoy weaving as much with the added pressure of having to make design decisions quickly and move on to the next project. (That is way too much like my "day" job. ; -)

Two of my personal goals are to weave fabric that has not been seen before. I also am striving to make complicated looking cloth with the least shafts, using every design tool in our tool box.

When I get that question about "how long does it take," I usually tell people my rough rule of thirds. 1/3 to plan, 1/3 to weave, 1/3 to finish (measure & calculate results for the next project, wash, press, twist fringe, hem, or make into a garment.) Actually, the part they see us demoing is usually the fastest/easiest part, isn't it?

 

sally orgren

I pulled the finished blanket warp off the loom last night and began my assessment of the project, measuring for take-up and comparing my projections and calculations to reality.

I was a bit surprised that all 4 blanket lengths came within an inch of each other. This must be a record for me! I weave in the evenings after work as time permits, so this warp was completed over a series of evenings, with stops and starts if I was interrupted. 

It occurred to me another way to measure progress is by consistency in multiple projects, and accuracy in estimation of materials. (I estimated it would take 5.5 cones of this yarn, and I was off by 1/2 a cone). I am trying very hard NOT to have a "SABLE" (Stash Accumulation Beyond Life Expectancy).

Dena (not verified)

I used to hate that question, "How long did it take you to make it?"  At some point, I realized that, more often than not, the reason someone will ask that question is because they have no idea about weaving, they want to start a conversation with me and they just don't know how to do it.  Unless there's a really good reason, I almost never answer the question directly.  I will launch into a discussion on how many threads are in the warp, how each thread needs to be measured, in correct order, threaded through two different holes in the loom, yadadada.  If they're not looking totally glazed over by that point, I'll start talking about weaving in production, how I can do that for one scarf or for ten scarves and then how I can change my weft color and make scarves coming off the same warp look completely different (and, of course, I'll be pulling work off the rack and handing it to them to demonstrate this).  By that point, I have talked so much, they have no idea what their original question is, but a new understanding and appreciation for what I'm doing.  If I'm really tired and I just don't have the energy for it, I look at them, laugh and say, "a long, long time!".
Submitted by sally orgren on