Can anyone please help me with the correct tie-up for the connection between the "toggles" and the 4 harnesses on the Louet W70/Kombo loom.   When facing the loom, there are 4 "toggles".   I would like to connect the left-most toggle to harness 1, the second to 2, 3rd to 3 and 4th to 4.  In the castle, behind the toggles, there are 4 metal rods, around which the connecting cord is passed.  If these are referred to as, from left to right, "1 to 4," can someone give instructions along the lines of "toggle one cord goes left under rod 1, right over 2 and 3 then under4" and so on for each of the 4 toggles.  Most grateful for any help.  Mike